Company Profile
Civil Engineering
Land Surveying
Wetland Sciences
Soils Testing
Directions
Links
Downloads
Home

Office Location:

Headquarters
165 East Grove Street
Middleborough, MA 02346
Phone: 1-508-946-9231
Fax: 1-508-947-8873

Civil Engineering


· Subdivision Design
· MGL Chapter 40B Site Designs and Permitting
· Road Layout
· Sewer and Pump Station Design
· Drainage Calculations
· Flood Plain Certifications
· Full Title V Septic System Design Services
  - Soil Evaluations
  - System Inspections
  - Design
  - Layout and As-Built Survey


REPRESENTATIVE PROJECTS
Project Town Description
Cherry Hill II Plymouth Addition to elderly housing complex for Plymouth Bay Housing Corp. and Plymouth Housing Authority, site design and permitting in progress as of January 2007.
Keith Place Middleborough 16-unit condominium with town water and sewer on 2.4 acres, permitted under MGL Ch. 40B, permitting completed 2006.
Old Cedar Village Bridgewater 36-unit condominium with town water and on-site septic system on 5.9 acres, under MGL Ch. 40B, construction completed 2006.
Cobblers Knoll Mendon 48-lot subdivision with individual wells and septic systems, and 28 lot open-space subdivision for residents over 55 years of age with a shared septic system, permitted under MGL Ch. 40B for affordable housing. 104 acre site. Construction commenced 2004.
Woodland Green Norton 44-unit detached condominium with town water and a large septic system on 45 acres, permitted under MGL Ch. 40B for affordable housing, construction completed 2004.
Fox Run Farm Medway 15-unit condominium with town water and sewer on 3.2 acre site, under MGL Ch. 40B, with Comprehensive Permit issued in 2005.
Jameson’s Ridge Boylston 32-lot subdivision with individual wells and septic systems on 45 acres, permitted under MGL Ch. 40B for affordable housing. Comprehensive Permit received March 2005.
Container Recycling Alliance Lakeville 11-acre site plan for Waste Management’s regional beverage-container, recycling facility, permits obtained in 2003.
Shaw’s Supermarket Carver Commercial plaza including a new supermarket. Responsible for construction layout and site work. Construction in progress.
Green Meadows West Bridgewater 30-lot conventional subdivision with town water and individual septic systems on 40 acres, construction completed 2003.
The Gables Abington 221-unit condo with town water and sewer on 40 Ac., designed per town zoning regulations, construction commenced 2002.