© 2017 by Outback Engineering Inc. Proudly created with Wix.com

  • Facebook - Grey Circle

 

  • Feasibility Studies and Land Planning

  • Residential, Commercial and Industrial Site Design

  • Subdivision Design and Permitting

  • Affordable Housing Development Site Design (MGL Ch. 40B)

  • Condominium Site Design and Permtting

  • Energy System Design and Permitting (Solar Farms and Wind Turbines)

  • Soil Evaluations & Percolation Testing

  • Title V Sewage Disposal System Designs

  • Water and Sewer Utility Layout

  • Stormwater Design and Management

  • Low Impact Development Design

  • Erosion and Sedimentation Control Plans

  • Engineering Reports

  • Construction Observation and Certifications

  • As-Built Plans

  • Expert Witness Testimony

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  • Boundary Surveys

  • Topographic Surveys

  • Land Court Surveys

  • Utility and Existing Conditions Surveys

  • Subdivision Plans

  • Condominium Plans

  • ALTA Plans

  • Existing Conditions Plans

  • FEMA Flood Elevation Certifications and Letter of Map Amendments (LOMA)

  • Property Line Staking

  • Construction Staking

  • As-built Surveys and Plans

  • Expert Witness Testimony

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  • Wetland resource area assessments and field delineation

  • Wetland restoration and mitigation plans

  • Conservation Commission filings for approval of wetland boundaries, Notices of Intent, and Requests for Determination of  Applicability

  • Erosion and Sedimentation Control Plans

  • Massachusetts Endangered Species Act (NHESP) Filings

  • DEP 401 Water Quality Certification Permits

  • Army Corps filings (404 permits)

  • Dock Design and Chapter 91 Applications

  • National Pollutant Discharge Elimination System(NPDES) Filings and Stormwater Pollution Prevention Plans (SWPPP)

  • FEMA Flood Elevation Certificates and Letter of Map Amendments (LOMA)

  • Massachusetts Environmental Policy Act (MEPA) Environmental Notification Forms (ENF) and Environmental Impact Reports (EIR)

  • Cranberry Grower bog-related permitting (WPA Exemptions, Farm Plans, Gravel Removal Permits) 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MEMBER NETTCP

DEP CERTIFIED SOIL EVALUATORS

  • Title 5 Soil Evaluation

  • Percolation Tests

  • Sieve Tests in lieu of Perc Tests 

  • Groundwater Determination

  • Laboratory Tests

        - Sieve and Hydrometer Tests

        - Proctor Tests

  • Soil Compaction Testing

  • Pavement Compaction Testing

 

SERVICES

1/6

1/4

1/3

1/6